Project08/ 10Healthcare
Villeneuve-Saint-Georges, transforming a hospital that never stops
Transforming a healthcare facility means working inside a dense technical environment where every interface matters.
- Location
- Villeneuve-Saint-Georges, France
- Type
- Hospital refurbishment
- Role
- BIM coordination and modelling.

main hospital building
refurbished
adjoining Women & Children’s unit
Source: specialist healthcare press.
01The project
Modernisation of the intercommunal hospital: refurbishment of the 11-storey, 33,000 m² main building, which houses most adult inpatient care and adjoins the Women & Children’s unit.
Works take place in a hospital that keeps admitting and treating patients: phasing, existing services and continuity of care shape the approach.
02The technical challenge
In a hospital, a poorly anticipated interface becomes a constraint on patient care.
Modelling an existing hospital, coordinating dense services and demanding plant spaces, and securing the interfaces between the refurbished building and live clinical areas.
03Our role
BIM coordination and modelling.
The workflow shown illustrates the method we apply to this type of assignment.
Typical workflow for this role
- Model federation
- Clash detection
- Review & decisions
- BCF issue tracking
- Coordinated model
04Related services
Expertise deployed
Planning works in an occupied building?
Send us your input data: drawings, brief, programme, BIM requirements. We will get back to you within 24 hours.