Project04/ 10Leisure, theme park
WDS Expansion, powering a park’s reinvention
A lake of nearly three hectares, a landscaped promenade and new themed lands: the expansion of Walt Disney Studios Park, now Disney Adventure World.
- Location
- Disneyland Paris, France
- Type
- Theme park expansion
- Role
- BIM modelling and BIM coordination of the electrical packages.
Image: Disneyland Pariscentral lake
of water
linking the park entrance to the new lands
Source: Disneyland Paris.
01The project
The expansion of Walt Disney Studios Park, now Disney Adventure World: a central lake of nearly 3 hectares (70,000 m³) and a large landscaped promenade linking the park entrance to the new themed lands.
Beneath the show, a dense electrical infrastructure powers lighting, effects, attractions and public spaces.
02The technical challenge
What guests never see must be coordinated just as precisely.
Modelling and coordinating electrical packages at park scale: cable routes, builder’s work and interfaces with landscape, water features and show elements.
03Our role
BIM modelling and BIM coordination of the electrical packages.
The workflow shown illustrates the method we apply to this type of assignment.
Typical workflow for this role
- Electrical package models
- Routes & builder’s work
- Clash detection
- Coordination reviews
- Coordinated model
Is your project driven by dense MEP packages?
Send us your input data: drawings, brief, programme, BIM requirements. We will get back to you within 24 hours.