Project01/ 10Offices, residential, high-rise

D5, a piece of city at full scale

A high-rise ensemble designed as a fragment of city, with offices and homes stacked on a shared podium.

Location
Boulogne-Billancourt, Paris
Type
New build
Role
BIM management, working closely with the design coordination team.
Discuss a similar project
D5 complex seen from Île Seguin, Boulogne-Billancourt
40,000m²

of offices, including the Renault Group headquarters

12,800m²

of housing

36months

programmed construction period

500operatives

on site at peak

Sources: BNP Paribas Real Estate, scheme data.

01The project

Facing Île Seguin, the D5 scheme brings together several buildings, each with its own architectural voice: 40,000 m² of offices, home to the Renault Group headquarters, and 12,800 m² of housing.

Several architectural practices, a large supply chain and up to six tower cranes on a single plot: the project concentrates the complexity of an entire district on a dense urban site.

02The technical challenge

At this scale, the model is no longer a deliverable. It is the common language of dozens of teams.

Keeping information consistent across buildings, designers and contractors, enforcing shared production standards, and de-risking the interfaces between offices, residential and high-rise structures.

03Our role

BIM management, working closely with the design coordination team.

The workflow shown illustrates the method we apply to this type of assignment.

Typical workflow for this role

  1. BIM execution plan
  2. Common data environment
  3. Model checking
  4. Coordination reviews
  5. Approved deliverables

Delivering a multi-building scheme with a large project team?

Send us your input data: drawings, brief, programme, BIM requirements. We will get back to you within 24 hours.