Project10/ 10Environment, infrastructure
Haliotis 2, infrastructure for the ecological transition
Rebuilding a metropolitan area’s main wastewater treatment works on its own seafront site, without interrupting service.
- Location
- Nice, France
- Type
- Infrastructure rebuild
- Role
- BIM coordination and modelling.

population equivalent design capacity
overall programme budget
of treated water reusable each year (announced capacity)
Source: Métropole Nice Côte d’Azur. Figures refer to the overall programme.
01The project
Rebuilding, on its own seafront site, the main wastewater treatment works of the Métropole Nice Côte d’Azur: a programme of around €700m, presented as France’s largest next-generation treatment plant project.
Water and sludge treatment, energy recovery, heat recovery and treated-water reuse: a complete plant, rebuilt while the existing one stays in operation.
02The technical challenge
Rebuilding a live treatment works means coordinating two plants at once.
Coordinating a large number of structures, process systems and networks, integrating operational buildings with industrial installations and maintaining continuity of service throughout the works.
03Our role
BIM coordination and modelling.
The workflow shown illustrates the method we apply to this type of assignment.
Typical workflow for this role
- Model federation
- Clash detection
- Review & decisions
- BCF issue tracking
- Coordinated model
04Related services
Expertise deployed
Preparing a major infrastructure project?
Send us your input data: drawings, brief, programme, BIM requirements. We will get back to you within 24 hours.