Project10/ 10Environment, infrastructure

Haliotis 2, infrastructure for the ecological transition

Rebuilding a metropolitan area’s main wastewater treatment works on its own seafront site, without interrupting service.

Location
Nice, France
Type
Infrastructure rebuild
Role
BIM coordination and modelling.
Discuss a similar project
Aerial view of the Haliotis wastewater treatment works in Nice
680,000PE

population equivalent design capacity

~€700m

overall programme budget

5M m³

of treated water reusable each year (announced capacity)

Source: Métropole Nice Côte d’Azur. Figures refer to the overall programme.

01The project

Rebuilding, on its own seafront site, the main wastewater treatment works of the Métropole Nice Côte d’Azur: a programme of around €700m, presented as France’s largest next-generation treatment plant project.

Water and sludge treatment, energy recovery, heat recovery and treated-water reuse: a complete plant, rebuilt while the existing one stays in operation.

02The technical challenge

Rebuilding a live treatment works means coordinating two plants at once.

Coordinating a large number of structures, process systems and networks, integrating operational buildings with industrial installations and maintaining continuity of service throughout the works.

03Our role

BIM coordination and modelling.

The workflow shown illustrates the method we apply to this type of assignment.

Typical workflow for this role

  1. Model federation
  2. Clash detection
  3. Review & decisions
  4. BCF issue tracking
  5. Coordinated model

Preparing a major infrastructure project?

Send us your input data: drawings, brief, programme, BIM requirements. We will get back to you within 24 hours.

Chat on WhatsApp